Over Bart Huizing
Deze auteur moet nog zijn bio toevoegenLaten we wel zeggen trots te zijn dat Bart Huizing al 6 bijdragen op zijn/haar naam heeft staan.
Artikelen door Bart Huizing
Re-Floating MV FLASH
14 december 2015 /8.185 Reacties/in Emergency Response, later project, Project Management /door Bart HuizingThe mv FLASH grounded at the most northern tip of Africa. All fuels were removed from the bulk carrier FLASH and after extensive lightering of cargo she was refloated and towed to a safe area were she was put at anchor.
Wreck removal consultancy
19 november 2015 /23.635 Reacties/in Consultancy, Recent projects, Wreck Removal /door Bart HuizingSalvage and Wreck removal consultancy In the summer of 2015 MASS consulted during the tender phases of the mv ‘SEWOL’ in Korea for Mammoet Salvage. In fall of 2015 MASS was involved in composing of a robust salvage and wreck removal plan during the tender phase of the wreck removal of the fishing vessel ‘Fong […]
Ship delivery
19 november 2015 /5.876 Reacties/in Recent projects, Ship delivery /door Bart HuizingShip delivery of newly built tugs ‘Sea Eagles Dolphin’ & ‘Sea Eagles Shark’ MASS assisted REDWISE Ship Delivery during the hand over and preperation of the newly built tugs ‘Sea Eagles Dolphin’ & ‘Sea Eagles Shark’ off roads at Hong Kong port. Both tugs were succesfully delivered to her new owners in Sharjah, UAE.
Shell Rig Moves on North Sea
19 november 2015 /28.447 Reacties/in Recent projects, Rig Move /door Bart HuizingThe past year MASS was involved as tow master and Shell Marine Offshore Representative in multiple rig moves for Shell-NAM in the North Sea: The rig ‘Atlantic Rotterdam’ was moved from Brigantines BG (UK sector) to the port of IJmuiden assisted by 165 t Bollard Pull lead tug ‘BB Troll’ and assisting tugs ‘Bugsier 19’ […]
FPSO Field Installation
19 november 2015 /7.799 Reacties/in Consultancy, FPSO installation, Project Management, Recent projects /door Bart HuizingFPSO Enquest Producer Field Installation and Hook-Up During the installation of the EnQuest Producer in the Alma-Galia field in spring of 2015, MASS was involved in connecting of the 9 pre-laid moorings to the turret of the FPSO. The AHT ‘Normand Progress’ picked up the moorings from seabed by means of ROV and succesfully connected […]