Re-Floating MV FLASH14 december 2015/in Emergency Response, later project, Project Management/door Bart HuizingThe mv FLASH grounded at the most northern tip of Africa. All fuels were removed from the bulk carrier FLASH and after extensive lightering of cargo she was refloated and towed to a safe area were she was put at anchor.